Pilot's Operating Handbook
Section 2
Limitations
EASA Approved
Edition 1 - January 15, 2018
Rev. 4
Page 2.6.4
Phase of flight
Notes
ICAO Flight
Plan Code
Reference
Documents
Operational limitations
Approved
PBN
Capability
Phase of flight
Notes
Item
18
PBN/
Item
10a
Code
Reference
Documents
Operational limitations
Approved
PBN
Capability
En-route,
Oceanic
and
Remote continental
(Class II Navigation)
RNP 4
GNSS
FDE
availability
must be verified prior to
flight. Maximum predicted
FDE
unavailability
is
25 minutes.
1
Two GNSS systems requi-
red to be operational.
2
FAA
AC 90-105A
R
L1
Additional
com-
munication
and
surveillance
equipment
may
be
required
to
obtain
ope-
rational approval
to utilize RNP 4
performance.
Departure
En-route continental,
Arrival
RNAV 2 /
RNAV 1
One GNSS system requi-
red to be operational,
JAA
TGL-10
FAA
AC 90-105A
R
C2 /
D2
Domestic,
Offshore,
Oceanic
and
Remote continental
RNP 2
GNSS
FDE
availability
must be verified prior to
oceanic
or
remote
continental flight. Maxi-
mum predicted FDE una-
vailability is 5 minutes.
Two GNSS systems requi-
red to be operational.
2
Only
one
operational
GNSS system required for
domestic
and
offshore
operations areas.
FAA
AC 90-105A
R
-
Additional
com-
munication
and
surveillance
equipment
may
be
required
to
obtain
ope-
rational approval
to utilize RNP 2
performance.
Departure,
Arrival,
RNP
1
(with and
without
RF legs)
At a minimum, the flight
director must be displayed
and
utilized
when
conducting
procedures
containing RF legs.
FAA
AC 90-105A
R
O2
Includes
RNP
terminal
departure
and
arrival
pro-
cedures.
This
includes
pro-
cedures
with
Radius-to-
Fix
legs (RF legs).
PIM - DO NOT USE FOR FLIGHT OPERATIONS