This table is accurate at the time it was published.
Table 2.6.1 - GNSS Operational Requirements
Phase of
flight
Approved
PBN
Capability
Operational limitations
Reference
Documents
ICAO
Flight Plan
Code
Notes
Item
10a
Cod
e
Item
18
PBN
/
En-route,
Oceanic
and
Remote
continental
(Class II
Navigation)
RNAV 10
RNP 10
GNSS FDE availability
must be verified prior to
flight. Maximum predicted
FDE unavailability is 34
minutes.
Two GNSS systems
required to be operational.
FAA
AC 90-105A
R
A1
Additional communication
and surveillance equipment
may be required to obtain
operational approval to
utilize RNP 10 / RNAV 10
performance.
En-route
continental,
Arrival
RNAV 5
(formerly
designated as
B-RNAV)
One GNSS system
required to be operational.
JAA
AMJ 20X2
R
B2
En-route,
Oceanic
and
Remote
continental
(Class II
Navigation)
RNP 4
GNSS FDE availability
must be verified prior to
flight. Maximum predicted
FDE unavailability is 25
minutes.
Two GNSS systems
required to be operational.
FAA
AC 90-105A
R
L1
Additional communication
and surveillance equipment
may be required to obtain
operational approval to
utilize RNP 4 performance.
Departure
En-route
continental,
Arrival
RNAV 2 /
RNAV 1
One GNSS system
required to be operational,
JAA
TGL-10
FAA
AC 90-105A
R
C2 /
D2
Domestic,
Offshore,
Oceanic
and
Remote
continental
RNP 2
GNSS FDE availability
must be verified prior to
oceanic or remote
continental flight. Maximum
predicted FDE
unavailability is 5 minutes.
Two GNSS systems
required to be operational.
Only one operational GNSS
system required for
domestic and offshore
operations areas.
FAA
AC 90-105A
R
-
Additional communication
and surveillance equipment
may be required to obtain
operational approval to
utilize RNP 2 performance.
Departure,
Arrival,
RNP 1 (with
and without
RF Legs)
At a minimum, the flight
director must be displayed
and utilized when
conducting procedures
containing RF Legs.
FAA
AC 90-105A
R
O2
Includes RNP terminal
departure and arrival
procedures. This includes
procedures with Radius-to-
Fix Legs (RF Legs).
Continue ►
Pilot's Information Manual
Section 2
Limitations
PIM TBM 960 - Edition 0
Rev. 00
Page 2.6.4
PIM - DO NOT USE FOR FLIGHT OPERATIONS