background image

User’s Manual 

8

 

 

Use M12 expansion bolts. Make sure that the thread length of expansion bolt is more 

than 80 mm (3.15''), and its total length is more than 150 mm (5.91''). 

 Install expansion bolt (top view) (mm [inch]) 

Figure 3-4

 

 

Thread  the  power  cable  and  the  signal  cable  separately  through  two  1-inch  PVC  pipes 

(buried in the foundation) to the cable holes next to the foundation. 

 

After installation, make sure that when opening the Barrier, there are no obstacles within a 

90° vertical range. 

 Installing Barrier 

3.2

3.2.1 Before You Start 

 

Read the manual carefully before installation. Refer to the barrier drawing attached to the 

casing to know the working method of the Barrier and its wiring. 

 

Check whether the power cable, signal cable, or internal wiring is loose or dropped. If yes, 

connect the cables well before installation. 

Lane 

Use M12 expansion bolt. Leave the bolt 

100mm (3.9'') above the ground surface 

 

Barrier arm 

Vehicle movement direction 

Summary of Contents for DHI-IPMECD-3011 Series

Page 1: ...Parking Barrier User s Manual V1 0 0 V1 0 0 ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD...

Page 2: ...DHI IPMECD 3011 RM2020 T20 DHI IPMECD 3011 LM2020 T20 DHI IPMECD 3011 RM1515 T09 AC110 DHI IPMECD 3011 LM1515 T09 AC110 DHI IPMECD 3011 RM1515 T14 AC110 DHI IPMECD 3011 LM1515 T14 AC110 DHI IPMECD 30...

Page 3: ...ECD 3013 DH IPMECD 3013 RM30 T14 DH IPMECD 3013 LM30 T14 DH IPMECD 3013 RM30 T20 DH IPMECD 3013 LM30 T20 DH IPMECD 3013 RM40 T20 DH IPMECD 3013 LM40 T2 Safety Instructions The following categorized si...

Page 4: ...he latest laws and regulations of related regions For detailed information see the paper manual CD ROM QR code or our official website If there is inconsistency between paper manual and the electronic...

Page 5: ...that the power supply requirement is subject to the device label Connect device type I structure to the power socket with protective earthing The appliance coupler is a disconnection device Keep a co...

Page 6: ...sing the surface of the Barrier to laser beam radiation Do not provide two or more than two kinds of power supply modes otherwise the Barrier might be damaged Do not lengthen or truncate the barrier a...

Page 7: ...ou Start 8 3 2 2 Installing Casing 9 3 2 3 Installing Radar 9 Installing Barrier Arm 11 3 3 3 3 1 Installing Folding Arm 11 3 3 2 Installing Straight Arm 12 3 3 3 Installing Fence Arm 13 Cable Connect...

Page 8: ...opening closing time of 0 9 s or 1 4 s Barrier with 4 m 13 12 ft straight arm enjoys opening closing time of 1 4 s Barrier with 5 m 16 40 ft straight arm enjoys opening closing time of 2 s Barrier wi...

Page 9: ...ying lifespan for more than 10 years Automatic lifting when the barrier arm meets obstacle Barriers with 3 m 9 84 ft or 4 m 13 12 ft straight arm support anti collision function A turning gear is inst...

Page 10: ...User s Manual 3 2 Structure Appearance 2 1 Straight Arm Barrier Straight arm barrier Figure 2 1 Folding Arm Barrier Folding arm barrier Figure 2 2...

Page 11: ...User s Manual 4 Fence Arm Barrier Fence arm barrier Figure 2 3 Dimensions 2 2 Dimensions mm inch Figure 2 4...

Page 12: ...well designed drive unit and balance spring the Barrier enjoys stable and reliable operation 3 Control box The intelligent barrier inverter and connection terminals are installed on the control board...

Page 13: ...ruction guide Foundation must be constructed before installing the Barrier Selecting Construction Site of Foundation The center of the foundation should be more than 300 mm 11 81 away from the road si...

Page 14: ...detection Use concrete of at least grade C15 Bury foundation bolts in the foundation Make sure that the bolts are exposed 100 mm 3 94 above the foundation Foundation bolt mm inch Figure 3 3 Optional I...

Page 15: ...n After installation make sure that when opening the Barrier there are no obstacles within a 90 vertical range Installing Barrier 3 2 3 2 1 Before You Start Read the manual carefully before installati...

Page 16: ...rol box and then place metal Step 3 plates on the foundation bolts Adjust the horizontal and vertical positions of the casing and then tighten the nuts with Step 4 a wrench 3 2 3 Installing Radar Open...

Page 17: ...User s Manual 10 Install radar 2 Figure 3 6 Apply silicone sealant around the radar on the outer surface of the casing for waterproofing...

Page 18: ...Mounting plate 3 M14 nut and spring washer 2 M14 140 hex head bolt and plain washer 4 Fixing plate Align the arm with the mounting plate and fix the mounting plate to the arm with M14 Step 1 M14 140...

Page 19: ...late 3 Straight arm 2 M14 140 hex head bolt and plain washer 4 M14 nut and spring washer Place the arm in the mounting plate and aign the holes of the arm with those of the Step 1 plate Thread the M14...

Page 20: ...e 3 9 Thread four M10 75 bolts and plain washers through parts 1 2 and 3 Step 1 Fix the bolts with four M10 nuts and spring washers Step 2 3 3 3 Installing Fence Arm Install fence arm Figure 3 10 Four...

Page 21: ...Fix parts 3 and 5 to part 2 and secure the bolts with M10 nuts and spring washers Step 3 Thread part 6 two JFM 1214 flange bearings through two sides of part 8 Step 4 Thread part 8 through part 1 and...

Page 22: ...ual 15 Cable Connection 3 4 3 4 1 Barrier Inverter Description Barrier inverter Figure 3 12 Table 3 3 Barrier inverter description Parameter Description Connects to remote control Ports for adjusting...

Page 23: ...se of power failure 7 ON Enable auto barrier opening in case of power failure 7 OFF Disable auto barrier opening in case of power failure 8 9 10 OFF by default Buttons Open barrier Close barrier Pair...

Page 24: ...ose of barrier VD Common anti smashing interface The barrier automatically closes after the anti smashing signal disappears Barrier switch control interface GOUP Opening signal interface GODN Closing...

Page 25: ...O1 camera and connect GND terminal to NC1 camera through port 4 terminal See green lines in the figure above Close barrier Generally you do not need to connect cables for controlling barrier closing s...

Page 26: ...intenance 4 2 4 2 1 Regular Maintenance Maintain the Barrier every three months to check The rubber buffer Mechanical transmission Whether there is abnormal noise during motor operation Whether the wi...

Page 27: ...e Barrier jitters obviously How to check angle sensor Cut off power supply to the Barrier and remove the three leads of the angle sensor Step 1 labeled 4 5 6 Use a multimeter 20K resistance and connec...

Page 28: ...User s Manual 21 Adjust balance spring Figure 4 1 Horizontal...

Page 29: ...able the auto check for updates function to obtain timely information of firmware updates released by the manufacturer We suggest that you download and use the latest version of client software Nice t...

Page 30: ...services SNMP Choose SNMP v3 and set up strong encryption passwords and authentication passwords SMTP Choose TLS to access mailbox server FTP Choose SFTP and set up strong passwords AP hotspot Choose...

Page 31: ...re are no communication requirements between two sub networks it is suggested to use VLAN network GAP and other technologies to partition the network so as to achieve the network isolation effect Esta...

Page 32: ...icensors or affiliated companies have been advised of the possibility of such damages Some jurisdictions do not allow limitations on liabilities for personal injuries incidental or consequential damag...

Reviews:

Related manuals for DHI-IPMECD-3011 Series