Installation 17
3
Installation
Unpacking the Box
3.1
Refer to the following checklist and check the package. If you find device damage or
component loss, contact the after-sales service.
Check
Sequence
Check Item
Check Content
1
Overall
packing
Appearance
No obvious damage.
Packing
Not distorted or broken.
Component
No missing.
2
Pedestal
Model on label
Matches purchase order.
Label
Not torn up.
Do not tear up or throw away the labels;
otherwise the warranty services are not
ensured. You need to provide the serial
number of the product when calling the
after-sales service.
3
Screen
Appearance
No obvious damage.
Data cable, power
line
No loose connection.
Contact the after-sale service staff
immediately if these cables or lines are
loose.
Installation
3.2
The following figures are for reference only and the actual product shall prevail.
We suggest that the height from the Signage to the ground should be 1.5m–2m. The final
installation height depends on your installation environment.
The installation surface is required to sustain at least 3 times the total weight of the bracket
and the Signage.
We do not provide wall-mount bracket and wall mount board in the packing box. You can
purchase them separately and ensure that the bracket and the board you bought conform
to the VESA standard.
Attach the wall-mount plate to the mounting surface with the four plastic expansion
Step 1
bolts and self-tapping screws in the accessory bag. You can calibrate mounting position
with a spirit level.