5 Electrical installation
Installation manual
11
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569811-1 – 2019.02
3
Connect the domestic hot water in and out pipes to the indoor
unit.
a b
c d
b
a
Space heating/cooling water OUT (Ø22 mm)
b
Space heating/cooling water IN (Ø22 mm) and shut-off
valve with integrated filter (accessory)
c
Domestic hot water: hot water OUT (Ø22 mm)
d
Domestic hot water: cold water IN (Ø22 mm)
NOTICE
It is recommended to install shut-off valves to cold water in
and hot water out connections. Shut-off valves are field
supplied.
NOTICE
About the shut-off valve with integrated filter (delivered as
accessory):
▪ The installation of the valve at the water inlet is
mandatory.
▪ Mind the flow direction of the valve
NOTICE
Install air purge valves at all local high points.
NOTICE
A pressure relief valve (field supply) with an opening
pressure of maximum 10 bar (= 1 MPa) must be installed
on the domestic cold water inlet connection in accordance
with the applicable legislation.
4.3.2
To connect the recirculation piping
Prerequisite:
Only required if you need recirculation in your system.
1
Remove the top panel from the unit, see
.
2
Cut out the rubber grommet on top of the unit, and remove the
stop. The recirculation connector is located below the space
heating/cooling water outlet pipe.
3
Route the recirculation piping through the grommet and connect
it to the recirculation connector.
4
Reattach the top panel.
4.3.3
To fill the space heating circuit
To fill the space heating circuit, use a field supply filling kit. Make
sure you comply with the applicable legislation.
NOTICE
▪ Air in the water circuit can cause malfunctioning of the
backup heater. During filling, it may not be possible to
remove all the air from the circuit. Remaining air will be
removed through the automatic air purge valves during
the initial operating hours of the system. Additional
filling with water afterwards may be required.
▪ To purge the system, use the special function as
described in the chapter
. This function should be used to purge the
heat exchanger coil of the domestic hot water tank.
4.3.4
To fill the domestic hot water tank
1
Open every hot water tap in turn to purge air from the system
pipe work.
2
Open the cold water supply valve.
3
Close all water taps after all air is purged.
4
Check for water leaks.
5
Manually operate the field-installed pressure relief valve to
ensure a free water flow through the discharge pipe.
4.3.5
To insulate the water piping
The piping in the complete water circuit MUST be insulated to
prevent reduction of the heating capacity.
Consider that the space heating piping can condensate during
cooling operation. Foresee adequate insulation for these pipes.
5
Electrical installation
DANGER: RISK OF ELECTROCUTION
WARNING
ALWAYS use multicore cable for power supply cables.
CAUTION
Do NOT push or place redundant cable length in the unit.
NOTICE
The distance between the high voltage and low voltage
cables should be at least 50 mm.
5.1
About electrical compliance
For the models EGSAH/X06+10DA9W(G), the following statement…
Equipment complying with EN/IEC 61000‑3‑12 (European/
International Technical Standard setting the limits for harmonic
currents produced by equipment connected to public low-voltage
systems with input current >16 A and ≤75 A per phase.).
…is valid in the following cases: