5 Electrical installation
Installation manual
17
EGSAH/X06+10DA9W(G)
Daikin Altherma 3 GEO
4P569811-1 – 2019.02
1×
2×
2
1
1×
b
a
X2M
14a
21
L
N
YC
Y1
1
2
3
1×
1×
b
3
Fix the cable with cable ties to the cable tie mountings.
5.9
To connect the space cooling/
heating ON/OFF output
Wires: (2+1)×0.75 mm²
Maximum load: 3.5 A, 250 V AC
—
1
Open the following (see
"3.2.1 To open the indoor unit" on
1
Top panel
3
2
5
1
4
2
User interface panel
3
Front panel
4
Installer switch box cover
5
Main switch box cover
2
Connect the alarm output cable to the appropriate terminals as
shown in the illustration below. Make sure to put wires 2 and 3
between the installer switch box and main switch box in a cable
sleeve (field supply) so that they are double insulated.
14a 21
YC
Y2
X2M
1
2
3
2
A4P
b
a
1+2
Wires connected to the alarm
output
3
Wire between the installer
switch box and main switch
box
a
Installation of EKRP1HB is
required.
b
Cable sleeve (field supply)
1×
2×
2
1
1×
b
Summary of Contents for Altherma 3 GEO
Page 38: ......
Page 39: ......
Page 40: ...4P569811 1 2019 02 Copyright 2019 Daikin 4P569811 1 0000000S ...