8
|
Electrical installation
Installer reference guide
110
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1 – 2019.07
A
Y1
7
B
A
B
7 9
X2M
A4P
Y1
YC
X1M
a
b
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
3
Fix the cable with cable ties to the cable tie mountings.
8.3.7 To connect the space cooling/heating ON/OFF output
INFORMATION
Cooling is only applicable in case of:
▪
Reversible models
▪
Heating only conversion kit (EKHVCONV2)
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
—
1
"6.2.5 To open the indoor unit"
61]):
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the space cooling/heating ON/OFF output cable to the appropriate
terminals as shown in the illustration below.