9
|
Configuration
Installer reference guide
175
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1 – 2019.07
Calculation of the electricity price:
Electricity price=Actual electricity price+Incentive/kWh
Electricity price=12.49+5
Electricity price=17.49
Price
Value in breadcrumb
Gas: 4.08 /kWh
[7.6]=8.6
Electricity: 12.49 /kWh
[7.5.1]=17
9.5.8 Information
Overview
The following items are listed in the submenu:
8
Information
Installer settings
User settings
Tank
Commissioning
[8]
Information
[8.1]
Energy data
[8.2]
Malfunction history
[8.3]
Dealer information
[8.4]
Sensors
[8.5]
Actuators
[8.6]
Operation modes
[8.7]
About
[8.8]
Connection status
[8.9]
Running hours
[8.A]
Reset
Dealer information
The installer can fill in his contact number here.
#
Code
Description
[8.3]
N/A
Number that users can call in case of problems.
Reset
Reset the configuration settings stored in the MMI (user interface of the indoor
unit).
Example:
Energy meterings, holiday settings.
INFORMATION
This does not reset the configuration settings and field settings of the indoor unit.
#
Code
Description
[8.A]
N/A
Reset the MMI EEPROM
to factory default
Possible read-out information
In menu…
You can read out…
[8.1]
Energy data
Produced energy, consumed electricity,
and consumed gas