10
|
Commissioning
Installer reference guide
204
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1 – 2019.07
(1)
Action step 1
(2)
Action step 2
Steps
1
Set the user permission level to
Installer
—
2
Go to [A.4.2]:
Commissioning
>
UFH screed dryout
>
Program
.
3
Program the schedule:
To add a new step, select the next empty line and change its
value. To delete a step and all steps below it, decrease the
duration to "–".
—
▪
Scroll through the schedule.
▪
Adjust the duration (between 1 and 72 hours) and
temperatures (between 15°C and 55°C).
4
Press the left dial to save the schedule.
To perform an underfloor heating screed dryout
INFORMATION
▪
If
Emergency
is set to
Manual
([9.5]=0), and the unit is triggered to start
emergency operation, the user interface will ask confirmation before starting.
The underfloor heating screed dryout function is active even if the user does NOT
confirm emergency operation.
▪
During underfloor heating screed dryout, pump speed limitation [9‑0D] is NOT
applicable.
NOTICE
To perform an underfloor heating screed dryout, room frost protection needs to be
disabled ([2‑06]=0). By default, it is enabled ([2‑06]=1). However, due to the
"installer-on-site" mode (see "Commissioning"), room frost protection will be
automatically disabled for 12 hours after the first power-on.
If the screed dryout still needs to be performed after the first 12 hours of power-on,
manually disable room frost protection by setting [2‑06] to "0", and KEEP it disabled
until the screed dryout has finished. Ignoring this notice will result in cracking of the
screed.
NOTICE
For the underfloor heating screed dryout to be able to start, make sure the following
settings are met:
▪
[4‑00]=1
▪
[C‑02]=0
▪
[D‑01]=0
▪
[4‑08]=0
▪
[4‑01]≠1
Steps
Conditions:
An underfloor heating screed dryout schedule has been programmed.
"To program an underfloor heating screed dryout schedule"
203].