5 Electrical installation
Installation manual
15
ETVH/9W(G)
Daikin Altherma 3 H HT F
4P586454-1 – 2019.07
A
Y2
7
B
A
B
7 9
X2M
A4P
Y2
YC
X1M
a
b
a
Installation of EKRP1HB is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector
backup heater). Do NOT change.
3
Fix the cable with cable ties to the cable tie mountings.
5.2.8
To connect the changeover to external
heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
"3.2.1 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the changeover to external heat source cable to the
appropriate terminals as shown in the illustration below.
A
X1
X2
L
N
B
A
B
A4P
X2M
X1
a
X2
a
Installation of EKRP1HB is required.
3
Fix the cable with cable ties to the cable tie mountings.
5.2.9
To connect the power consumption digital
inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection
(voltage supplied by PCB)
[9.9]
Power consumption control
.
1
"3.2.1 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
Summary of Contents for Altherma 3 H HT F Series
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ...4P586454 1 2019 07 Copyright 2019 Daikin 4P586454 1 0000000U...