2 Components
Service manual
70
EBLQ+EDLQ011~W1 + EBLQ+EDLQ011~0W1
+ EK(2)CB EKMB9W1
Daikin Altherma – Monobloc
ESIE18-04 – 2019.02
16
Loosen and remove the 7 screws that fix the main PCB to the
PCB mounting plate.
17
Remove the main PCB.
18
To install the new outdoor unit main PCB, see
.
To install the main PCB
1
Install the main PCB on its correct location on the PCB
mounting plate.
2
Install and tighten the 7 screws that fix the main PCB to the
PCB mounting plate.
a
e
m
d
m
m
m
m
o
m
m
b
c
g
k
n
h
l
i
j
f
a
Wire terminal U
b
Wire terminal V
c
Wire terminal W
d
Wire terminal LD
e
Wire terminal LE
f
Connector X5A
g
Connector X11A
h
Connector X12A
i
Connector X21A
j
Connector X22A
k
Connector X32A
l
Connector X111A
m
Screw
n
PCB mounting plate
o
Main PCB
3
Connect the wire terminals NA, LA , LB and NB.
4
Connect the connectors X5A, X11A, X12A, X21A, X22A, X32A
and X111A to the main PCB.
5
Connect the wire terminals U, V, W, LD and LE to the main
PCB. Install and tighten the screws to fix the terminals.
6
Install the upper assembly on the lower assembly and slide it to
the left to hook and latch the upper and lower assemblies.
a
b
c
c
c
a
Upper assembly
b
Lower assembly
c
Hook