2 Components
Service manual
71
EBLQ+EDLQ011~W1 + EBLQ+EDLQ011~0W1
+ EK(2)CB EKMB9W1
Daikin Altherma – Monobloc
ESIE18-04 – 2019.02
7
Connect the connectors X205A and X9A.
b
k
e
f
d
c
g
i
k
g
l
a
a
h
i
i
j
a
Latch
b
Wire terminal mounting plate
c
Wire terminal LB
d
Wire terminal NB
e
Faston connector with orange wire (+)
f
Faston connector with grey wire (-)
g
Tie strap
h
Red and blue wiring
i
Cable guide
j
Compressor wiring
k
Connector X205A
l
Connector X9A
8
Route the compressor wiring in the cable guide.
9
Route the red and blue wiring in the cable guide.
10
Connect the 2 Faston connectors.
11
Install new tie straps.
12
Connect the wire terminals LB and NB to the main PCB.
13
Install the wire terminal mounting plate.
14
Install the switch box.
Is the problem solved?
Action
Yes
No further actions required.
No
of the
main PCB and continue with the
next procedure.
To adjust the wiring of the main PCB
1
Adjust the wiring according to the wiring diagram and
connection diagram, see
"5.2 Wiring diagram" on page 101
.
2
Check that all connectors are fully plugged‑in. All colour codes
MUST correspond.
3
Check that no connectors are damaged.
Is the problem solved?
Action
Yes
No further actions required.
No
of the
main PCB and continue with the
next procedure.
2.17.2
Double fan outdoor unit – three phase
Checking procedures
INFORMATION
It is recommended to perform the checks in the listed
order.
To check the HAP LED of the main PCB
Prerequisite:
Turn OFF the unit via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
.
1
Turn on the unit using the respective circuit breaker.
2
Locate the HAP LED on the main PCB.