Si-95
Test Operation
Test Operation Inverter K Series
53
<Settings of switches on the PC board adaptor>
Outdoor unit external control adaptor
<Changeover by cool/heat central remote controller>
<Switch settings on adaptor printed circuit board>
■
SS1
(“BOTH” is selected when demand
control is carried out at the same
time.)
■
SS2
■
DS1·2
BOTH C / H
DE
C / H
(SL302)
OFF
ON
OFF
(SL303)
■
SS1
(When demand control is used
together, set the switch to “BOTH”)
■
SS2
■
DS1·2
For individual control, do not use the same address twice.
BOTH C / H
DE
Cool
(SL305)
OFF
ON
ON
(SL306)
SI-95.BOOK Page 53 Friday, March 31, 2000 10:59 AM