BP Unit Control
Si18-525B
130
Function
6.2.3 Full Closing of Electronic Expansion Valves
Purpose of the
Function
The electronic expansion valves are initialized when the power is turned on.
Details
The following processes are conducted.
1. Conducts P1 pulses close when power is turned on, and sets current opening to 0 pulse
(fully closing process).
2. Sends electronic expansion valve initialization signal to outdoor unit.
3. Closes the electronic expansion valve of each chamber (sets the electronic expansion valve
pulse to 0).
4. Stops transmission of electronic expansion valve initialization signal when EVH retightening
is completed.
6.2.4 Control Based on EV Opening Command from Outdoor Unit
Purpose of the
Function
This function operates the electronic expansion valve based on EV opening command sent from
the outdoor unit.
Outline
The electronic expansion valve operation based on EV opening command provides the
following functions.
1) Pressure equalization prior to startup
2) Startup control
3) Restart standby
4) Pump-down residual operation
5) Oil return operation
6) Defrost operation
Power ON
P 1
P 1
0
0
P 1
0
P 1
0
EVA
EVB
EVC
EVH
(M1047)
Summary of Contents for D-Series
Page 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Page 33: ...List of Functions Si18 525B 20 List of Functions ...
Page 71: ...Specifications Si18 525B 58 Specifications ...
Page 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Page 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Page 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Page 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Page 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Page 475: ...Si18 525B vi Index ...