Si18-525B
Outdoor Unit
Removal Procedure
417
4
Disconnect the HPS
connector and the
electrical box connector
from each other.
HPS connector: Red
Electrical box connector: White
5
Remove the clamp and
unbind the leads.
Cut off with nippers.
The clamp is to be kept in stock.
6
Remove the clamp
(reactor lead).
Cut off with nippers.
7
Remove the screw.
8
Remove the clamp
(reactor lead).
Cut off with nippers.
9
Remove the two clamps
and disconnect the
compressor lead.
Step
Procedure
Points
(Q0483)
(Q0484)
(Q0485)
Summary of Contents for D-Series
Page 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Page 33: ...List of Functions Si18 525B 20 List of Functions ...
Page 71: ...Specifications Si18 525B 58 Specifications ...
Page 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Page 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Page 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Page 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Page 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Page 475: ...Si18 525B vi Index ...