Si18-525B
BP Unit
Removal Procedure
425
2. BP Unit
2.1
Removal of
PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the PCB.
1
Remove the 4 screws
from the electrical box
cover. Detach the
cover.
2
The PCB is as shown at
right. Disconnect all the
relay cables.
The PCB is coated resistant to
moisture. This means that the
fuse and varistor cannot be
replaced.
When reassembling, have test
operation for checking wrong
wiring.
(Q0501)
(Q0502)
Summary of Contents for D-Series
Page 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Page 33: ...List of Functions Si18 525B 20 List of Functions ...
Page 71: ...Specifications Si18 525B 58 Specifications ...
Page 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Page 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Page 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Page 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Page 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Page 475: ...Si18 525B vi Index ...