Test Operation
Si18-525B
160
Test Operation
1.
Test
Operation
1.1
Procedure and Outline
Follow the following procedure to conduct the initial test operation after installation.
1.1.1 Check work prior to turn power supply on
1.1.2 Turn power on
Check on refrigerant piping
Check on amount of refrigerant
charge
(V3180)
Check the below items.
2
Power wiring
2
Control transmission wiring
between units
2
Earth wire
{
Is the power supply single-phase 220-230V / 50Hz?
{
Have you finished a ductwork to drain?
{
Have you detach transport fitting?
{
Is the wiring performed as specified?
{
Are the designated wires used?
{
Is the grounding work completed?
Use a 500V megger tester to measure the insulation.
2
Do not use a megger tester for other circuits than 200-230V circuit.
{
Are the setscrews of wiring not loose?
{
Is the electrical component box covered with an insulation cover
completely?
{
Is pipe size proper? (The design pressure of this product is
4.0MPa.)
{
Are pipe insulation materials installed securely?
Liquid and gas pipes need to be insulated. (Otherwise causes
water leak.)
{
Are respective stop valves on liquid and gas line securely open?
{
Is refrigerant charged up to the specified amount?
If insufficient, charge the refrigerant from the service port of stop
valve on the liquid side with outdoor unit in stop mode after turning
power on.
{
Has the amount of refrigerant charge been recorded on “Record
Chart of Additional Refrigerant Charge Amount”?
Turn outdoor unit power on.
Carry out field setting on
outdoor PC board
Turn indoor unit power on.
(Q0398)
{
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Summary of Contents for D-Series
Page 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Page 33: ...List of Functions Si18 525B 20 List of Functions ...
Page 71: ...Specifications Si18 525B 58 Specifications ...
Page 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Page 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Page 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Page 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Page 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Page 475: ...Si18 525B vi Index ...