Si18-525B
Field Setting
Test Operation
181
3.2.5
Check Operation
To prevent any trouble in the period of installation at site, the system is provided with a test
operation mode enabling check for incorrect wiring, stop valve left in closed, and judgment of
piping length.
Unit stopping
Press the TEST button for 5 seconds.
10 sec to 10 minutes
LED display (H1P~H7P) (
8
:
ON
9
:
BLINKING
3
:
OFF)
3383333
3933338
Pressure equalizing
Step 1
30 sec to 200 sec
10 minutes
To 30 seconds
3933383
Cooling start control
Step 2
3933388
3933888
3938333
3383333
Stability waiting operation
Step 3
Pump down residual operation
Step 7
5 minutes
Standby for restarting
Completion
Step 8
•
Stop valve close check
•
Wrong wiring check
3 minutes
3933833
3933838
3933883
Judgement function
Step4~6
CHECK OPERATION FUNCTION
(Q0383)
Summary of Contents for D-Series
Page 1: ...Si18 525B Applied Models Super Multi Plus Cooling only Super Multi Plus Heat Pump D Series ...
Page 33: ...List of Functions Si18 525B 20 List of Functions ...
Page 71: ...Specifications Si18 525B 58 Specifications ...
Page 117: ...Refrigerant Flow for Each Operation Mode Si18 525B 104 Refrigerant Circuit ...
Page 171: ...Indoor Unit SkyAir Models Si18 525B 158 Function ...
Page 207: ...Test Operation and Field Setting for RA Indoor Unit Si18 525B 194 Test Operation ...
Page 336: ...Si18 525B Service Check Function Troubleshooting 323 ...
Page 469: ...Wiring Diagrams Si18 525B 456 Appendix ...
Page 475: ...Si18 525B vi Index ...