6
Insulated
Panels
Roof Curb Installation
ROOF CURB POST-INSTALLATION CHECKS
After installation, check the top of the curb, duct connection frame
and duct flanges to make sure gasket has been applied properly.
Gasket should be firmly applied to the top of the curb perimeter,
duct flanges and any exposed duct connection frame. If gasket is
loose, re-apply using strong weather resistant adhesive.
P
ROTRUSION
Inspect curb to ensure that none of the utility services (electric)
routed through the curb protrude above the curb.
I
F
PROTRUSIONS
EXIST
,
DO
NO
ATTEMPT
TO
SET
UNIT
ON
CURB
.
CAUTION
ROOF TOP DUCT CONNECTIONS
Install all duct connections on the unit before placing the unit on
rooftop.
RIGGING DETAILS
WARNING
T
O PREVENT PROPERTY DAMAGE, THE UNIT SHOULD REMAIN IN AN UPRIGHT
POSITION DURING ALL RIGGING AND MOVING OPERATIONS.
T
O FACILITATE
LIFTING AND MOVING WHEN A CRANE IS USED, PLACE THE UNIT IN AN
ADEQUATE CABLE SLING.
D
O
NOT
LIFT
UNITS
TWO
AT
A
TIME
. P
ROVISIONS
FOR
FORKS
HAVE
BEEN
INCLUDED
IN
THE
UNIT
BASE
FRAME
. M
INIMUM
FORK
LENGTH
IS
72”
TO
PREVENT
DAMAGE
TO
THE
UNIT
.
CAUTION
Provisions for forks have been included in the unit base frame. No
other fork locations are approved.
WARNING
T
O PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE, PERSONAL
INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE OBSERVED
WHEN INSTALLING THE UNIT.
• Unit must be lifted by the four lifting holes located at the
base frame corners.
• Lifting cables should be attached to the unit with shackles.
• The distance between the crane hook and the top of the
unit must not be less than 60”.
• Two spreader bars must span over the unit to prevent
damage to the cabinet by the lift cables. Spreader bars
must be of sufficient length so that cables do not come in
contact with the unit during transport. Remove wood
struts mounted beneath unit base frame before setting
unit on roof curb. These struts are intended to protect
unit base frame from fork lift damage. Removal is
accomplished by extracting the sheet metal retainers and
pulling the struts through the base of the unit. Refer to
rigging label on the unit.
Important:
If using bottom discharge with roof curb, ductwork
should be attached to the curb prior to installing the unit. Ductwork
dimensions are shown in Roof Curb Installation Instructions.
Refer to the Roof Curb Installation Instructions for proper curb
installation. Curbing must be installed in compliance with the Na-
tional Roofing Contractors Association Manual.
Lower unit carefully onto roof mounting curb. While rigging unit,
center of gravity will cause condenser end to be lower than supply
air end.
SEE CAUTION BELOW