4
5.
Apply insulation B and D.
Ensure the edge of insulation B and D is flush with the top
edge of the drain pan. (See view G and J of Figure 6 and 7.)
Fold over the remaining insulation to inside of drain pan.
Firmly press the insulation along the surface of drain pan.
Don’t allow any air gap/bubble between insulation and
drain pan (See Section J-J and Section K-K of Figure 6 and
7).
G
H
H
Insulation B
Section H-H
View G
For DPICX-*A
Flush edge of
insulation with edge
of drain pan
Attach the insulation
along the surface of
drain pan
Insulation B
Drain pan
Figure 6
G
H
H
Flush edge
of insulation
drain pan
Insulation B
Section H-H
View G
For DPICX-*B
Attach the insulation
along the surface of
drain pan
Insulation B
Drain pan
Bottom View of Drain Pan
Bottom View of Drain Pan