For details of typical external fixings of ductwork etc to the unit cabinet refer to drawing 
A4-500621 

Commissioning & Testing 
 
Pre-run Check 
 

With the unit electrically isolated the following work should be done: 
 
1)  Although  the  fan  section  will  have  been  factory  checked  prior  to  despatch  it  is 

always  possible  for  components  to  loosen  during  shipment.  Therefore  the  section 
must be inspected to ensure there are no loose components. 

 
2)  The  fan  impeller  must  be  able  to  rotate  freely  by  hand  and  be  clear  of  all  foreign 

materials. Check that the pulleys / bushes are secure on shafts and that the key is 
fitted.  Also  check  the  pulley  alignment  and  belt  tension.  (See  belt  tensioning 
instructions) 

 
3)  Ensure that the unit is clear of all debris. Clean out as necessary. 
 
4)  Remove  all  temporary  restraints  that  are  fitted  inside  the  fan  section  at 

Daikin 

Applied (UK) Ltd 

factory for transport purposes. 

 
5)  Ensure that the anti-vibration mounts and flexible connections allow the fan to move 

freely and that movement is not constrained by any cabling etc. 

 

 

6)  Check that the pipe work to the coils is correctly connected and that the coil fins are 

free from foreign matter and not damaged. 


7)  Prime all drain traps. 
 
8)  Zero the filter manometers, minihelic or magnehelic pressure gauges. 
 
9)  If all filters are already fitted then remove the secondary filters until after the initial 

run.  If  there  are  no  filters  fitted  in  position  it  is  recommended  that  initially  only  the 
first stage filters be fitted where there is more than one stage of filters and that the 
secondary filters only be fitted after the initial run. 

 
 

The  size,  type  and  quantity  of  filter  cells  required  will  be  stated  on  the  General 
Arrangement  (GA)  drawing  and  confirmed  by  a  list  fixed  to  the  inside  of  the  filter 
access door. 

 
 

Ensure that the filter cells are installed correctly and that the airflow arrows point the 
correct  way. Where applicable, ensure that side-sealing strips are fitted to prevent 
air by-pass of the filters. 

 
10)  Check  that  all  dampers  are  operating  correctly  and  that  they  are  fully  open  when 

starting a backward curved fan. 

Summary of Contents for Easdale 25

Page 1: ...REV A PAGE 9 SECTION 11 ADDED 11 03 14 Page 1 of 37 Installation Operation and Maintenance Instructions For The Easdale 25 50 Air Handling Units...

Page 2: ...missioning and Testing Page 16 Drive Belts Page 17 18 Belt Tensioning Instructions Pulley Alignment Instructions Page 21 22 Maintenance Procedures Component Installation Maintenance Page 23 Fans Page...

Page 3: ...o be used It is manually isolated from the mains supply before any work is carried out DO NOT enter the unit while the fans are running Electrical equipment is earthed to comply with all I E E Regulat...

Page 4: ...study has been made of this manual This manual deals in detail with shipping installation commissioning and servicing and must be strictly adhered to Wherever any maintenance or work is done within t...

Page 5: ...connections have been isolated and isolators padlocked in the OFF position Safety Information continued Before starting the Air Handling Units ensure that all access doors and panels are closed and cl...

Page 6: ...ly supplied complete with an integral channel base Should these not be required e g in the case of stacked units then the sections will be shipped on wooden pallets Upon receipt of equipment a visual...

Page 7: ...n wooden pallets that they are left in place until the units have been correctly sited This will help prevent site damage and will aid handling If this recommendation is not adhered to then it is not...

Page 8: ...ctions must remain level during lifting or manhandling Under no circumstances should they be tilted onto their side 6 If sections are either too heavy or too wide to use lifting bars then the channel...

Page 9: ...arallel to each other and that there is contact with each face of the two sections 5 Use an access door if possible to gain access to the joint for joining the two sections together Refer to the Secti...

Page 10: ...ti vibration mounts which have been factory installed To prevent damage to these during transport temporary restraints are fitted to the fan base inside all fan sections For details refer to drawing A...

Page 11: ...otor drive must be rotated by a third of a turn Failure to do this can invalidate the Daikin Applied UK Ltd warranty Unit Interior Surfaces If ducting is not connected to the unit it is essential that...

Page 12: ...ing of anti corrosion grease or other anti corrosion agent on all the parts that may be subject to rusting Care must be taken to ensure that the storeroom is always dry and well ventilated whilst the...

Page 13: ...ns The sizes of the cables and contactors must be suitable for the load carried A 240v AC supply is required for each light switch fuse protection by others Motor connection details are contained with...

Page 14: ...anti vibration mounts and flexible connections allow the fan to move freely and that movement is not constrained by any cabling etc 6 Check that the pipe work to the coils is correctly connected and t...

Page 15: ...may be necessary to start the fan with the access door open or side panel removed Strict attention to personal safety must be adhered to at all times All work must comply with the Health and Safety a...

Page 16: ...the motor to twist round It is recommended that a close inspection be performed after the unit has been running for approximately 7 days from original start up A check should be made to ensure 1 The d...

Page 17: ...5 kg SPA 80 132 mm 2 5 3 6 kg 140 200 mm 3 6 4 6 kg SPB 112 224 mm 4 6 6 6 kg 236 315 mm 6 6 8 7 kg SPC 224 355 mm 8 7 11 7 kg 375 560 mm 11 7 15 3 kg Belt Tensioning Procedure Using a Belt Tension I...

Page 18: ...force to the kilogram force value in the table above If a Belt Tension Indicator is not available a spring balance and rule will suffice IMPORTANT After the drive has been running for approximately fo...

Page 19: ...electrically isolated before any panel is removed e g fan control panels electric coils etc 2 The fan has stopped rotating prior to anyone entering the unit At least two 2 minutes after switching off...

Page 20: ...nvironment in which the unit is used Failure to carry out regular maintenance will result in poor performance in terms of unit and filter efficiency and could lead to early and costly breakdowns Adequ...

Page 21: ...re originally supplied with the unit The new belts should be tensioned and the belt guard screen where provided must be replaced 3 Check filter pressure drops and replace filters as necessary It is re...

Page 22: ...Alvania R A Annual Checks 1 Check coils to ensure the fins are not blocked or have become dirty Fins should be cleaned using a brush and a vacuum cleaner Failure to keep a coil clean will result in lo...

Page 23: ...tored in a clean dry area and the fan shaft should be rotated at least every two 2 months to minimise bearing damage If the fan is in storage for six 6 months or more then the bearings should be compl...

Page 24: ...ipped with sufficient grease for a long operating period If re lubrication is needed using a low pressure hand operated grease gun pump in clean recommended grease until the new grease appears at the...

Page 25: ...e nuts should be checked with fingers If they are loose tighten them down lightly with a spanner 9 Test the high temperature cut out This check is to be performed as follows a Make a note of the prese...

Page 26: ...le drain connection to be connected to an appropriate trapping system Care must be taken to ensure that the correct type of drain trap is used depending on whether it is positive or negative air press...

Page 27: ...s Any pipe movement caused by expansion or contraction must be absorbed by flexible joints Coils located at high points of the system should be regularly vented otherwise coils may become air locked c...

Page 28: ...air leaving face of the coil Alternatively the coil can be washed down with a mild solution of detergent and water after which the coil should be thoroughly rinsed with clean water The power supply m...

Page 29: ...c pressure in the coil while as much as 75 of full condensate load has to be handled by the steam trap This is especially important for coils exposed to outside air since sub atmospheric conditions ca...

Page 30: ...t is then pumped to the overhead return Traps must be designed to operate at maximum pressure at the control valve inlet and sized to handle the full condensate load at a pressure differential equal t...

Page 31: ...age can be cleaned as follows Remove dust and fibres with a soft long haired brush or with a vacuum cleaner Take care when cleaning with compressed air that the exchanger package is not damaged Note K...

Page 32: ...g of the damper as this may affect the damper mechanism Ductwork must be independently supported and should not be left to hang from the damper Sealing should be in the form of a neoprene strip Ensure...

Page 33: ...xceptions Synsafe RAVO F7 Bag 170 Synsafe RAVO F8 Bag 215 Synsafe RAVO F9 Bag 275 Final Stage Hepa Filter H10 H13 400 Washable Panel Filters Maintenance is generally as per disposable filters except w...

Page 34: ...ifier section the 1 BSP male drain connection has to be connected to an appropriate trapping system Refer to the GA drawing for location of the drain connection Care must be taken to ensure that the c...

Page 35: ...of AVM s Failure to cure fault signifies suspect spring Excessive noise from unit Bearing failure on fan or motor Check bearings Fan impeller fouling inlet cone Check clearances Drive belts incorrect...

Page 36: ...otify Daikin Applied UK Ltd of equipment damaged on receipt in writing within seven 7 days Failure to run equipment within the design specifications as notified at the time of order Modifications to d...

Page 37: ...ble Foam Filled Panels Landfill Sheet Steel Recycle Motors Recycle or Landfill Corners Recycle Coils Recycle Heatcube Plastic aluminium Recycle Flexible Connection Landfill Filters Dirty Landfill AVM...

Reviews: