Daikin Applied (UK) Ltd.
REV A
– PAGE 9. SECTION 11 ADDED. 11/03/14
Page 19 of 37
Maintenance Procedures
General
All maintenance work should be carried out with the highest regard for safety. All work
must comply with the Health and Safety at Work Act 1974, all relevant H.S.E. Guidance
Notes and Codes of Practice. Only competent personnel must be employed in the
maintenance of the unit.
Ensure that the following is adhered to:-
1) All electrical equipment is electrically isolated before any panel is removed, e.g. fan,
control panels, electric coils etc.
2) The fan has stopped rotating prior to anyone entering the unit. At least two (2)
minutes after switching off power should be allowed for this.
3) Under no circumstances must externally driven fans be allowed to run with the drive
guard removed.
4) When checking the fan speed on internally driven fans it is recommended that a
strobe light be used.
5) In the case of electrostatic filters, that the cells have been earthed in line with the
instructions supplied with the equipment.
Door handles must not be used as footholds, otherwise damage or injury may
result.