Daikin Applied (UK) Ltd.
REV A
– PAGE 9. SECTION 11 ADDED. 11/03/14
Page 9 of 37
All fixing channels, clamps,hardware, etc., for connecting the sections together are
supplied by
Daikin Applied (UK) Ltd.
These are boxed separately and are placed inside
the fan section for shipment.
The assembly procedure is as follows:
1)
Referring to the General Arrangement (GA) drawing, ensure the sections are in the
correct order of airflow, are correctly orientated and are central to each other.
2)
Individual sections are shipped loose for site assembly by others and support legs
(if applicable) are supplied loose for site fitting by others.
3)
Ensure that the sections are aligned and levelled to the tolerances as shown on
the Section to Section Assembly drawing A4-920058.
On some larger units, to aid stability during lifting and shipping, temporary
corner bracing is fitted to the open ends of a section as shown on drawing A4-
500646. The bracing must be removed prior to bringing together the joint faces of
adjacent sections. This is to allow the fitting of section to section joining
channels.
4)
Ensure that the mating faces of each section are parallel to each other and that
there is contact with each face of the two sections.
5)
Use an access door if possible to gain access to the joint for joining the two
sections together. Refer to the Section to Section Fixing Detail drawing A4-STS07
for INT50 unit or A4-STS09 for INT25 unit and the Assembly drawing for site fitting
of section to section joining for installation. If the joint is not accessible via an
access door then remove a side panel adjacent to the joint using a Philips head
screwdriver.
6)
Replace all panels upon completion.
7)
For weatherproof units see FWR01 for joint sealing, water shed etc.
8)
Do not start unit up until at least 24 hours after all sections are assembled together
and the flush internal channels have been fitted inside the unit.
9)
If the units are stacked then ensure that the top section is lifted onto the bottom
section in accordance with the previously listed lifting recommendations.
10)
Fit the top section to the bottom section through the fixing holes in the top sections
channel base using self tapping screws and large outside diameter washers. If the
unit has a damper, or duct, between the top and bottom sections then refer to
drawing A4
–EMP05 for details on the method of sealing and fixing
11)
On multi deck units refer to EMP36 for unit fixing and clamping arrangement.