11
PIM00504
1.5.3 Maintenance
inspections
DANGER
Maintenance inspections must be performed by an appropriately qualified technician.
Otherwise, there is a risk of electric shock and injury.
Check that the input power supply is OFF before starting the work. Otherwise, there is a risk of
electric shock.
Check that the motor is stopped, and wait at least 5 minutes after powering OFF before starting
the work. Otherwise, there is a risk of electric shock.
While the product is powered up, do not change the wiring, or connect/disconnect terminals,
etc. Otherwise, there is a risk of electric shock, accidents and damage.
CAUTION
Wear protective glasses and gloves while carrying out the work.
Do not touch the controller board directly. Otherwise, it could be damaged by static electricity.
Carry out withstand voltage tests at DC2kV or lower. Applying voltages higher than this may
cause damage.
Do not perform Megger testing on control circuits. This could damage the product.
Do not disassemble this product. Otherwise, there is a risk of electric shock and injury.
1.5.4 Disposal
CAUTION
When disposing of this product, entrust it to a specialist contractor as general industrial waste.