4
Set-up and installation
Installation and maintenance instructions
15
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1444099_00 – 07/2018 – EN
5
Installing the Daikin Altherma EHS(X/H) at the installation site.
▪ When setting up the unit in a cabinet, behind panels or in other
restricted conditions, ensure sufficient ventilation (e.g. using
ventilation gratings). If the total refrigerant charge in the system
is ≥ 1.84 kg, further requirements of the ventilation openings
must be met (see
4.4
Preparing the device for
installation
4.4.1
Remove the front screen
1
Undo the screws (1.).
2
Press the lateral holding burls upwards with your fingers (2.),
stem from above with the thumbs.
3
Remove the front screen to the front (3.).
Fig. 4-7
Remove the front screen
4
After completing the installation
: Place the front screen
straight directly above the rotary switch of the RoCon+ HP.
Press on the top and bottom until the front screen is securely en-
gaged again.
4.4.2
Remove the protective cover
1
Undo the screws (1.).
2
Unhook the protective cover from the rearward facing holding
burls (2.), lift at the back (3.) and remove to the front (4.).
Fig. 4-8
Remove the protective cover
A
Fig. 4-9
Without protective cover
4.4.3
Moving the controller housing to the
service position
To facilitate work on the hydraulics of the Daikin Altherma EHS(X/H),
the control box can be moved to the service position.
1
Loosen the screws (1) of the holder of the controller housing.