【INSTRUCTION MANUAL】
DAIKIN INDUSTRIES, LTD
.
SE-04430
Att.
1
[Attached document
A
]
【
Change points of the PC setup pressure
】
1. The PC pressure change point of the standard valve block (fixed setup pressure relief valve).
When the PC setup pressure of the standard valve block (fixed setup pressure relief valve
)
is changed,
following work is necessary.
①
Confirmation of the number of revolutions at pressure hold, before the change of PC setup pressure.
②
The change of PC setup pressure.
③
The change of the valve block . (note)
④
The adjustment of flow control valve.
Note) The valve block is different in working pressure.
When you have changed PC setup pressure, refer to spare parts list, or consult with our Sales Division.
Caution
・
Be sure to change the valve block after turning off the power supply surely.
・
Be sure to do under the condition that hydraulic oil temperature surely falls down.
You may be burned, immediately after the operation.
・
When removes some pipes, be careful of leakage of hydraulic oil.
(3) Pressure sensor
(5) Pressure setup value
marking position
70
(2) Hose fitting
(4) Bolt installation hole (four points)
A position of hose band
tightening
Valve
block
Valve block
Hose fitting
(1)Hose band
Tightening bolt (four)
Valve block (fixed setup pressure
relief valve)