Mounting and commissioning
)$(.65'6$(1
13
X
X
During heating up, liquid must be able to escape via the
discharge line of the safety valve (no obstructions).
Install the safety valve in such a way that it
cannot be
shut off
.
Do not install shut-off valves, filters or similar equipment.
X
Install the solar pump assembly in such a way that no ex-
ternal forces can act on the components after it has been
installed.
X
Do not overheat the components by welding or soldering
work performed on the system. Install the solar pump as-
sembly after completion of such welding or soldering
work.
X
Thoroughly flush the pipes prior to installing the solar
pump assembly. Impurities such as weld beads, hemp or
metal chips cause leaks of the safety valve and the check
valves.
X
Verify that the nominal pressure of the solar pump as-
sembly corresponds to the specification value of the sys-
tem.
X
Verify that the liquid in the system and the application ar-
ea of the solar pump assembly are compatible.
6.1 Mounting
(.65'6$
;
Sealing surfaces have been check for cleanliness and
damage.
;
All pipe ends are perpendicular and have been deburred.
(.65'6$
is delivered ready to be installed. Do not dis-
assemble parts.
1.
Remove the upper insulation.
2.
Hold
(.65'6$
with the lower insulation to the wall
(align with a level) and mark two positions.
Summary of Contents for EKSRDS2A
Page 2: ......
Page 28: ......
Page 50: ......
Page 78: ......
Page 88: ...Specifiche tecniche 65 6 7 11 4 Specifiche tecniche Fig 2 Dimensioni mm 65 6 5 6 6ROSXPS ...
Page 104: ......
Page 134: ......
Page 144: ...Dados técnicos 65 6 37 10 4 Dados técnicos Figura 2 Dimensões mm da 65 6 5 6 ...
Page 162: ......
Page 172: ...Teknik Veriler 10 65 6 75 4 Teknik Veriler Resim 2 Ebatlar mm EKSRDS2A ...
Page 176: ...Montaj ve işletmeye alma 14 65 6 75 6 Üst izolasyonu yerleştirin Resim 3 EKSRDS2A montajı ...
Page 191: ......
Page 192: ... ...