Mounting and commissioning
14
)$(.65'6$(1
3.
Drill holes (Ø 10 mm) at the position of the two marks and
insert the enclosed dowels. Screw the long hanger bolt in-
to the top hole, the short hanger bolt into the bottom hole.
4.
Fit
(.65'6$
with the bottom insulation and secure it
with a washer and a nut.
5.
Connect the pipes of the solar circuit to the connections of
the fittings.
6.
Refit the upper insulation.
Fig. 3: Mounting
(.65'6$
Summary of Contents for EKSRDS2A
Page 2: ......
Page 28: ......
Page 50: ......
Page 78: ......
Page 88: ...Specifiche tecniche 65 6 7 11 4 Specifiche tecniche Fig 2 Dimensioni mm 65 6 5 6 6ROSXPS ...
Page 104: ......
Page 134: ......
Page 144: ...Dados técnicos 65 6 37 10 4 Dados técnicos Figura 2 Dimensões mm da 65 6 5 6 ...
Page 162: ......
Page 172: ...Teknik Veriler 10 65 6 75 4 Teknik Veriler Resim 2 Ebatlar mm EKSRDS2A ...
Page 176: ...Montaj ve işletmeye alma 14 65 6 75 6 Üst izolasyonu yerleştirin Resim 3 EKSRDS2A montajı ...
Page 191: ......
Page 192: ... ...