Mounting and commissioning
)$(.65'6$(1
19
4.
Screw hose connectors to the filling and flushing valves
and connect hoses. Open the shut-off valves (
1, 2
) and
close the shut-off (
3
) for filling.
5.
Fill the system with solar liquid via the upper valve (
1
).
6.
As soon as solar liquid escapes via valve (
2
), close this
valve.
7.
Apply pressure to the system.
8.
Close the upper valve. Turn back the shut-off (3).
9.
Vent the system, see chapter 7.2, page 21.
10.
Set both
ball valves to 0° position
.
11.
Fit the upper part of the heat insulation onto the fitting
group.
12.
The heat insulation of the pipes should reach into the cor-
responding recess of the heat insulation of the solar pump
assembly.
ª
The solar pump assembly is ready for operation.
Summary of Contents for EKSRDS2A
Page 2: ......
Page 28: ......
Page 50: ......
Page 78: ......
Page 88: ...Specifiche tecniche 65 6 7 11 4 Specifiche tecniche Fig 2 Dimensioni mm 65 6 5 6 6ROSXPS ...
Page 104: ......
Page 134: ......
Page 144: ...Dados técnicos 65 6 37 10 4 Dados técnicos Figura 2 Dimensões mm da 65 6 5 6 ...
Page 162: ......
Page 172: ...Teknik Veriler 10 65 6 75 4 Teknik Veriler Resim 2 Ebatlar mm EKSRDS2A ...
Page 176: ...Montaj ve işletmeye alma 14 65 6 75 6 Üst izolasyonu yerleştirin Resim 3 EKSRDS2A montajı ...
Page 191: ......
Page 192: ... ...