For safety reasons, liquid must be able to escape via the dis-
charge line of the safety valve during heating.
X
X
Do not shut off
the safety valve.
X
If the safety valve has responded, check the system prior
to resuming operation.
Proper operation is only possible if the ball valves are open (0°
setting, see fig. 6, page 18).
7.1 Reading mark at flow meter
The lower edge of the float is the reading mark at the flow me-
ter.
Fig. 7: Reading mark at flow meter
Summary of Contents for EKSRDS2A
Page 2: ......
Page 28: ......
Page 50: ......
Page 78: ......
Page 88: ...Specifiche tecniche 65 6 7 11 4 Specifiche tecniche Fig 2 Dimensioni mm 65 6 5 6 6ROSXPS ...
Page 104: ......
Page 134: ......
Page 144: ...Dados técnicos 65 6 37 10 4 Dados técnicos Figura 2 Dimensões mm da 65 6 5 6 ...
Page 162: ......
Page 172: ...Teknik Veriler 10 65 6 75 4 Teknik Veriler Resim 2 Ebatlar mm EKSRDS2A ...
Page 176: ...Montaj ve işletmeye alma 14 65 6 75 6 Üst izolasyonu yerleştirin Resim 3 EKSRDS2A montajı ...
Page 191: ......
Page 192: ... ...