background image

ERAP110~170MBYNN
Air-cooled condensing units
4PW22680-1E

Installation manual

2

O

PERATION

 

RANGE

M

AIN

 

COMPONENTS

 

(refer to the outlook diagram supplied

with the unit)

S

ELECTION

 

OF

 

LOCATION

This is a class A product. In a domestic environment this product may
cause radio interference in which case the user may be required to
take adequate measures.

The equipment is not intended for use in a potentially explosive
atmosphere.

The units are designed either for roof mounting or ground level
mounting and should be installed in a location that meets the
following requirements:

1

The foundation is strong enough to support the weight of the unit
and the floor is flat to prevent vibration and noise generation.

2

The space around the unit is adequate for servicing and the
minimum space for air inlet and air outlet (refer to the operation
manual) is available.

3

There is no danger of fire due to leakage of inflammable gas.

4

Select the location of the unit in such a way that neither the
discharged air nor the sound generated by the unit disturb
anyone.

5

Make sure that the air inlet and outlet of the unit are not
positioned towards the main wind direction. Frontal wind will
disturb the operation of the unit. If necessary, use a windscreen
to block the wind.

I

NSPECTING

 

AND

 

HANDLING

 

THE

 

UNIT

At delivery, the unit should be checked and any damage should be
reported immediately to the carrier claims agent.

When handling the unit, take into account the following:

1

Lift the unit preferably with a crane and belts in accordance with
the instructions on the unit. The length of the ropes (1) to be
used for lifting are 6 m minimum each.

2

The unit is shipped with wooden beams (2) under it, these have
to be removed before installation.

U

NPACKING

 

AND

 

PLACING

 

THE

 

UNIT

1

Remove the wooden beams from the unit.

2

Install vibration mountings in case of a roofmounted unit or other
installation where noise and vibration might be an impediment.

3

Set the unit on a solid and level foundation.

Ground level mounting:

The concrete foundation should approximately be 100 mm
higher than the floor level for ease of plumbing work and better
drain.

A

Outdoor temperature (°C DB)

B

Evaporating temperature (°C) (Suction dew point)

Standard operation range

Standard

Range for pull down operation

1

Condenser

2

Compressor 1 (M1C) with pressure relief valve

3

Discharge stopvalve

4

Liquid stopvalve

5

Suction stopvalve

6

Suction line

7

Liquid line

8

Drier + charge valve

9

Power supply intake

10

Emergency stop (S5E)

11

Switchbox

12

Digital display controller 

13

Transportbeam

14

Ambient temperature sensor (R5T)

15

Field wiring intake

16

Main isolator switch (optional - S13S)

B

A

43

2

18

-15

0

11

39

NOTE

Try to reduce the drilling in the unit to a minimum. If
drilling is impreventable, remove the iron filling
thoroughly in order to prevent surface rust!

Roof mounted

:

The unit should be installed on  
steelchannel or I-beam frame to support 
the unit on the roof, or it can be installed 
on a concrete base.

Ground level mounted

:

The unit should be installed on a solid 
base. It is recommended to fix the unit on 
a concrete base with anchor bolts.

Anchor bolt

Model

A

B

C

D

E

size

Qty

ERAP110

3000

2210

410

1215

2125

M16X200

4

ERAP150

3000

2210

410

1215

2125

M16X200

4

ERAP170

3000

2210

410

1215

2125

M16X200

4

1

2

>200

>350

100

>100

50

>B

1

2

3+4

5

6

7

X-X

X

X

>A

D

>B

E

C

Summary of Contents for ERAP110MBYNN

Page 1: ...ERAP110MBYNN ERAP150MBYNN ERAP170MBYNN INSTALLATION MANUAL Air cooled condensing units...

Page 2: ...ji t no E pou it modul F v souladu s osv d en m G Kategorie rizik H Viz tak n sleduj c strana 15 kako je izlo eno u A i pozitivno ocijenjeno od strane B prema Certifikatu C kako je izlo eno u Datoteci...

Page 3: ...l stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi 14 Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS TSmin...

Page 4: ...BMS Connection MODBUS J BUS BACNET LON Features Stepless capacity control 30 100 Low ambient operation 15 C Liquid line solenoid valve Voltage free contacts general operation pump or fan contact alarm...

Page 5: ...he length of the ropes 1 to be used for lifting are 6 m minimum each 2 The unit is shipped with wooden beams 2 under it these have to be removed before installation UNPACKING AND PLACING THE UNIT 1 Re...

Page 6: ...mmediately when exposed to air Open the liquid stop valve discharge stop valve and suction valve if provided Vacuum the unit and perform a leak test Charging the unit 1 Perform an integral pre start i...

Page 7: ...n each phase and an earth leak detector Recommended fuses are mentioned on the wiring diagram supplied with the unit Connection of the air cooled condensing unit power supply 1 Using the appropriate c...

Page 8: ...ons the user password is asked by default when resetting a safety This password however can be changed to or to Remote digital controller address To avoid damage to the controllers liquid crystals dur...

Page 9: ...turn the fan pump on or off manually This means that when the unit is off the fan pump can also be turned on at any time to check the pump Defining the BMS settings The BMS parameters allowing communi...

Page 10: ...nted in a holder on the air cooled evaporator The setpoint for the temperature of the cooling battery will change depending on the relative humidity in the room For this purpose a relative humidity se...

Page 11: ...cuit The operation of the water chiller is then controlled by the Digital Display Controller Shut down by switching off the controller and the circuit breaker of the power circuit WARNINGS Emergency s...

Page 12: ...4PW22680 1E Copyright Daikin...

Reviews: