ESiEN09-06 A
Test Operation
Test Operation
107
NOTE:
• For check operation, the following work will be performed.
Check of shutoff valve opening
Check of miswiring
Judgment of piping length
Check of refrigerant overcharge
• It takes about 40 minutes to complete the check operation.
[Check Operation Procedure]
STEP1
Make the onsite setting as needed using the dip switches on the outdoor unit PC-board
(A1P) with the power off
STEP2
Close the EL. COMPO. BOX lid and all front panels except as the side of the EL.
COMPO. BOX and turn on the power to the outdoor unit and all connected AHUs.
(Be sure to turn the power on at least 6 hours before operation in order to have power
running to the crank case heater.)
STEP3
Check the LED display on the outdoor unit PC-board (A1P) is as shown in the table
below and transmission is normal.
LED display: ...OFF, ...ON,
...Blinking
STEP4
Make the onsite settings as needed using the push button (BS1-BS5) on the outdoor
unit PC-board (A1P) with the power on.
STEP5
Perform the check operation following the Check Operation Method of the [Service
Precautions] label on the EL. COMPO. BOX lid. The system operation for about 40
minutes and automatically stops the check operation.
If the malfunction code is not displayed in the remote controller after the system stop,
check operation is completed. Normal operation will be possible after 5 minutes. If the
malfunction code is displayed in the remote controller, correct the malfunction following
[Remote controller displays malfunction code] and perform the check operation again.
LED display
(Default status of shipped)
SERV.
MONI-
TOR
MODE TEST/
HWL
C/H SELECTOR
L.N.O.P DEMA-
ND
MULTI
IND
MASTE
R
SLAVE
HAP
H1P
H2P
H3P
H4P
H5P
H6P
H7P
H8P
Single system
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...