EKEQ EKEQDCBV3
Option kit for combination of Daikin condensing units
with field supplied air handling units
4P383212-1 - 2014.08
Installation and operation manual
73
Electrical work
1
Open the electrical box cover (A).
2
Push out
ONLY
the second lower wire intake hole (B) from
inside to outside. Do not damage the membrane.
3
Pass valve cable (with wires Y1 ... Y6) from the control box
through that membrane wire intake hole and connect the cable
wires into the terminal connector (C) following instructions as
described in step 4. Route the cable out of the valve kit box
according to figure below and fix with the tie wrap (D). See
"Electric wiring work" on page 74 for more details.
4
Use a small screwdriver and follow indicated instructions for
connecting cable wires into the terminal connector according to
the wiring diagram.
5
Make sure that field wiring and insulation is not squeezed when
closing the valve kit box cover.
6
Close the valve kit box cover (4x M5).
I
NSTALLATION OF THE ELECTRICAL CONTROL
BOX
(See figure 4 and figure 6)
Mechanical installation
1
Fix the control box with its hanger brackets to the mounting
surface.
Use 4 screws (for holes of Ø6 mm).
2
Open the lid of the control box.
3
For electrical wiring: refer to paragraph "Electric wiring work" on
page 74.
4
Install the screw nuts.
5
Close the unnecessary openings with stoppers (closing cups).
6
Close the lid securely after installation to ensure that the control
box is watertight.
A C
D
B
1
Control box
2
Hanger brackets
3
Main PCB
4
Transformer
5
Terminal
6
PCB (for voltage conversion)
7
PCB (power supply)
8
Magnetic relay (operation / compressor ON/OFF)
9
Magnetic relay (error status)
10
Magnetic relay (fan)
11
Magnetic relay (defrost)
12
Optional PCB (KRP4)
NOTE
Refer to figure 7 for the required service space.
Summary of Contents for ERQ Series
Page 2: ......
Page 16: ...Combination Table ESiEN09 06 A 6 General Information...
Page 17: ...ESiEN09 06 A Specifications 7 1 Specifications 8 1 1 Outdoor Units 8...
Page 33: ...ESiEN09 06 A Function general Function 23 1 2 Operation Mode...
Page 58: ...Outline of Control ESiEN09 06 A 48 Function...
Page 71: ...ESiEN09 06 A Wiring Diagram of Control Box Control Box EKEQ CBV3 61 3 2 F box...
Page 109: ...Test Operation ESiEN09 06 A 100 Test Operation 1 2 2 Turn power on...