5 Piping installation
Installation manual
11
ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH
₂
O
4P679468-1A – 2022.07
1
2
6
Cut open the top cover.
If the space heating/cooling or the domestic hot water pipes are
directed upwards, the top cover must be cut along the perforation
with a suitable tool.
7
Support the water piping.
For rearward facing connections: Support hydraulic lines suitably
according to the spatial conditions. This is valid for all water pipes.
d
c
b
a
a
Space heating/cooling water OUT (screw connection, 1")
b
Space heating/cooling water IN (screw connection, 1")
c
Domestic hot water OUT (screw connection, 1")
d
Domestic cold water IN (cold water supply)(screw
connection, 1")
NOTICE
It is recommended to install shut-off valves on the space
heating/cooling water in and out connections, as well as on
the domestic cold water in and domestic hot water out
connections. These shut-off valves are field supplied.
NOTICE
Install air purge valves at all local high points.
NOTICE
A pressure relief valve (field supply) with an opening
pressure of maximum 10 bar (=1 MPa) must be installed
on the domestic cold water inlet connection in accordance
with the applicable legislation.