7
|
Unit installation
Installer reference guide
80
EPRA14~W1 + ETSH/X(B)16P30+50EF
Daikin Altherma 3 H HT ECH₂O
4P679467-1A – 2022.07
NOTICE
Provide at least 150 mm of free space below the unit. Additionally, make sure the
unit is positioned at least 100 mm above the expected level of snow.
Use the drain plug (with O-ring) and a hose for drainage.
1
2
a
b
c
c
3
d
a
Drain hole
b
O-ring (delivered as accessory)
c
Drain plug (delivered as accessory)
d
Hose (field supply)
NOTICE
O-ring.
Make sure the O-ring is installed correctly to prevent leakage.
7.3.6 To install the discharge grille
INFORMATION
Electrical wiring.
Before installing the discharge grille, connect the electrical wiring.
Install the lower part of the discharge grille
1
Insert the hooks.
2
Insert the ball studs.
Summary of Contents for ETSX16P30EF
Page 303: ...16 16...