7
|
Unit installation
Installer reference guide
71
EPRA14~18D + ET23E
Daikin Altherma 3 H HT F
4P644739-1A – 2022.03
7.4 Mounting the indoor unit
7.4.1 About mounting the indoor unit
Typical workflow
Mounting the indoor unit typically consists of the following stages:
1
Installing the indoor unit.
2
Connecting the drain hose to the drain.
7.4.2 Precautions when mounting the indoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"7.1 Preparing the installation site"
7.4.3 To install the indoor unit
1
Lift the indoor unit from the pallet and place it on the floor. Also see
2
Connect the drain hose to the drain. See
"7.4.4 To connect the drain hose to
72].
3
Slide the indoor unit into position.
4
Adjust the height of the leveling feet to compensate for floor irregularities.
The maximum allowed deviation is 1°.
≤1°
NOTICE
Do NOT tilt the unit forwards:
0°
1° 1°
Summary of Contents for ETVZ16E6V7
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ...4P644739 1A 2022 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...