ESIE98–06A
General Outline
Part 1 – System Outline
1–11
3
1
4
5
1
EUWY5-30HB/C
In the following table you will find the electrical specifications of chiller types EUWY5-30HB/C:
Nominal conditions
The nominal conditions are as follows:
■
entering/leaving chilled water temperature 12/7 °C, ambient air temperature 35 °C
■
entering/leaving condenser water temperature 45/50 °C; ambient 7 °CDB/6 °CWB
■
power input is total input:
comp control circuit
■
sound pressure level is measured at a height of 1.5 m and a distance of 1 m in front of the unit.
Operation range
The operation range contains:
■
a leaving evaporator water temperature from 4 °C till 20 °C (pull-down condition till 25 °C)
■
a leaving condenser water temperature from 35 °C till 55 °C.
Model
EUWY5HB
EUWY8HB
EUWY10HB
EUWY15HC
EUWY20HC
EUWY25HC
EUWY30HC
Compressor
phase
3~
Voltage
220 - 380 V
starting current
49 A
79 A
109 A
49 A/109 A
109 A
49 A/109 A
109 A
max. running current
10 A
18 A
21 A
21 A+10 A
2x21 A
2x21 A+10 A
3x21 A
starting method
direct on line
voltage
400 V
nominal running current
5.5 A
9.7 A
12.5 A
5.5 A+12.5 A
2x12.5 A
2x12.5 A+
5.5 A
3x12.5 A
Nominal distribution system voltage
phase
3N~
frequency
50 Hz
voltage
400 V
voltage tolerance
±10 V
Control circuit
phase
1~
recommended fuses
factory installed
voltage
230 V
Unit
nominal running current
8 A
13.2 A
16 A
23 A
31 A
38 A
46 A
recommended fuses
3 x 20 aM
3 x 25 aM
3 x 32 aM
3 x 40 aM
3 x 50 aM
3 x 63 aM
3 x 80 aM
max. running current
12.5 A
21.5 A
24.5 A
36 A
48 A
59.5 A
71.5 A
Summary of Contents for EUWA/Y5-30HB/C(Z)
Page 2: ......
Page 8: ...Introduction ESIE98 06A vi 3 1 4 5...
Page 10: ...ESIE98 06A 1 2 Part 1 System Outline 3 1 1 4 5...
Page 28: ...General Outline ESIE98 06A 1 20 Part 1 System Outline 3 1 1 4 5...
Page 36: ...Piping Layout ESIE98 06A 1 28 Part 1 System Outline 3 1 1 4 5...
Page 52: ...ESIE98 06A Wiring Layout Part 1 System Outline 1 44...
Page 58: ...ESIE98 06A 2 2 Part 2 Functional Description 3 1 2 4 5...
Page 100: ...ESIE98 06A 3 2 Part 3 Troubleshooting 3 1 3 4 5...
Page 134: ...Troubleshooting ESIE98 06A 3 36 Part 3 Troubleshooting 3 1 3 4 5...
Page 136: ...ESIE98 06A 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 142: ...Pre Test Run Checks ESIE98 06A 4 8 Part 4 Commissioning and Test Run 3 1 4 5...