General Outline
ESIE10-01
1–14
3
11
4
5
Evaporator Flow switch
- Supplied separately to be wired and installed on the evaporator water
piping (by the customer).
Suction line shut off valves
- Installed on the suction port of the compressor to facilitate maintenance
operation. High pressure gauges.
Kit container.
Rubber type antivibration mounts
- Supplied separately, these are positioned under the base of the
unit during installation. Ideal to reduce the vibrations when the unit is floor mounted.
Spring type antivibration mounts
- Supplied separately, these are positioned under the base of the
unit during installation. Ideal for dampening vibrations for installation on roofs and metallic structures.
Hydronic Kit (single water pump) (available only on chiller with 2 compressors)
- Hydronic kit
consists of: single direct driven centrifugal pump, water filling system with pressure gauge, safety
valve, drain valve. The motor pump is protected by a circuit breaker installed in control panel. The kit
is assembled and wired to the control panel. The pipe and pump are protected from freezing with an
additional electrical heater.
Hydronic Kit (twin water pumps) (available only on chiller with 2 compressors)
- Hydronic kit
consists of: twin direct driven centrifugal pumps, water filling system with pressure gauge, safety valve,
drain valve. The motor pump is protected by a circuit breaker installed in control panel. The kit is
assembled and wired to the control panel. The pipe and pumps are protected from freezing with an
additional electrical heater.
Witness test
- Every unit is always tested at the test bench prior to the shipment. On request, a second
test can be carried out, at customer's presence, in accordance with the procedures indicated on the
test form. (Not available for units with glycol mixtures).
Acoustic test
- On request, a test can be carried out, at customer's presence (Not available for units
with glycol mixtures).
Evaporator right water connections (available only on 2 compressor sizes).
Evaporator flanged connections.
Refrigerant recovery tank
- This option allows to stock refrigerant charge of 1 circuit for maintenance
operation. Liquid receiver includes in/out shut-off valve and reliefe valve.
Compressors circuit breakers.
Ground fault protection
- To shut down the entire unit if a ground fault condition is detected.
Summary of Contents for EWAD620-C17C-SL
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5 ...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2 ...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3 ...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps ...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board ...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board ...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board ...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1 ...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2 ...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3 ...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control ...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2 ...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3 ...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5 ...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5 ...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5 ...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1 ...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5 ...