General Outline
ESIE10-01
1–94
3
11
4
5
Unit limitation -
Electrical wiring
(optional)
The machine's microprocessor allows for the limitation of capacity by means of two separate criteria:
Q
Load limitation
The load can be varied directly by means of 4-20 external signal or directly from a BMS. The sig-
nal cable must be directly connected to terminals 37 and 38 of the M5 terminal board. The signal
cable must be of the shielded type and must not be laid in the vicinity of the power cables, so as
not to induce interference with the electronic controller.
Q
Current limitation (optional)
This option, if installed, allows for the control of machine load according to current absorbed. Con-
nect a switch, timer, clean BMS to terminals 37-39 on the terminal board M5. Once the digital
input is closed, the microprocessor will limit the current absorbed by the machine according to the
command set point set. The enabling of this control needs enabling by means of a clean contact,
using terminals 6-9 on terminal board M5.
Caution:
The two options cannot be enabled simultaneously. Setting one function excludes the other.
General alarm
Pump1 command
Evaporator flowswitch
Current limit enable
External fault
Double setpoint
Setpoint override (4-20 mA)
Common
Demand limit (4-20 mA)
Current limit (4-20 mA)
Pump2 command
On-off remote
Comp1 alarm
Comp2 alarm
General Alarm
Pump#1 command
Evaporator flow-switch
Current Limit Enable
External Fault
Double set-point
Set-point Override (4-20mA)
Common
Demand Limit (4-20mA)
Current Limit (4-20mA)
Pump#2 command
On-Off remote
Comp#1 Alarm
Comp#2 Alarm
Max 2A
F116
L
L
N
N
250 Vac
Max 2A
250 Vac
User connection to the interface M3 terminal board
Summary of Contents for EWAD620-C17C-SS
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board...
Page 127: ...ESIE10 01 General Outline Part 1 System Outline 1 121 3 1 4 5 1 36 17 Extension Control Fans 4...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5...