Refrigerant circuit
Each unit has 2 or 3 independent refrigerant circuits and each one includes:
Q
Compressor with integrated oil separator.
Q
Air Cooled Condenser.
Q
Electronic expansion valve.
Q
Evaporator.
Q
Discharge line shut off valve.
Q
Liquid line shut off valve.
Q
Suction line shut off valve (optional).
Q
Sight glass with moisture indicator.
Q
Filter drier.
Q
Charging valves.
Q
High pressure switch.
Q
High and low pressure transducers.
Electrical control
panel
Power and control are located in two sections of the main panel that is manufactured to ensure
protection against all weather conditions. The electrical panel is IP54 and (when opening the doors)
internally protected with Plexiglas panel against possible accidental contact with electrical
components (IP20). The main panel is fitted with a main switch interlocked door.
Power Section
The power section includes compressors fuses, fan circuit breaker, fan contactors and control circuit
transformer.
MicroTech III controller
MicroTech III controller is installed as standard; it can be used to modify unit set-points and check
control parameters. A built-in display shows chiller operating status plus temperatures and pressures
of water, refrigerant and air, programmable values, set-points. A sophisticated software with predictive
logic, selects the most energy efficient combination of compressors, EEXV and condenser fans to
keep stable operating conditions to maximise chiller energy efficiency and reliability. The compressors
are automatically sequenced to ensure equal operating hours and number of starts. MicroTech III is
able to protect critical components based on external signs from its system (such as motor
temperatures, refrigerant gas and oil pressures, correct phase sequence, pressure switches and
evaporator). The input coming from the high pressure switch cuts all digital output from the controller
in less than 50 ms, this is an additional security for the equipment. Fast program cycle (200 ms) for a
precise monitoring of the system. Floating point calculations supported for increased accuracy in P/T
conversions.
Summary of Contents for EWAD620-C17C-SS
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board...
Page 127: ...ESIE10 01 General Outline Part 1 System Outline 1 121 3 1 4 5 1 36 17 Extension Control Fans 4...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5...