Mechanical Installation
Shipping
The stability of the machine during shipping must be ensured. If the machine is shipped with a wooden
cross-plank on its base, the cross-plank must be removed only after the final destination has been
reached.
Responsibility
The manufacturer declines all responsibility, present and future, for any damage to persons, animals
or property caused by negligence of operators failing to follow the installation and maintenance
instructions in this manual. All safety equipment must be regularly and periodically checked in
accordance with this manual and with local laws and regulations regarding safety and environmental
protection.
Safety
All activities concerning the machine, be they: movement, installation, start-up or maintenance, must
in any case comply with all current laws on safety and only be carried out by authorised, qualified
personnel.
Thus stated, the following are some warnings, although the list is not intended as exhaustive:
Q
The machine must be firmly secured to the ground.
Q
The machine can only be lifted and moved by correctly using the lifting points on the machine base,
marked in yellow. These are the only points that can support the entire weight of the unit, and only
if used according to the lifting diagram described in this manual.
Q
The machine can only be used safely once it has been firmly secured to the ground or to an
equivalent structure.
Q
Do not access the electrical components if the machine is not in safe conditions.
Q
Do not access the electrical components without having opened the machine's general switch to
disconnect the power supply.
Q
An insulating platform must be used.
Q
Do not access the electrical components if water and/or moisture are present.
Q
All operations on the refrigerant circuit and on pressurised components must be carried out by
qualified personnel only.
Q
Replacement of a compressor or addition of lubricating oil must be carried out by qualified
personnel only.
Q
Sharp edges and the surfaces of the condensing section, can cause injury. Avoid direct contact.
Q
Disconnect the machine's electrical supply by opening the general switch, before working on the
cooling fans and/or compressors. Failure to comply with this rule may cause serious personal
injury.
Q
Avoid introducing solid bodies into the water pipes while the machine is connected to the system.
Q
A mechanical filter must be installed on the water pipe connected to the heat exchanger inlet. The
filter must have a maximum mesh size of 500
μ
m.
Q
The machine is supplied with safety valves installed on both the high and low pressure sides of the
refrigerant gas circuit.
Summary of Contents for EWAD620-C17C-SS
Page 2: ......
Page 8: ...ESIE10 01 1 2 Part 1 System Outline 3 1 1 5...
Page 111: ...ESIE10 01 General Outline Part 1 System Outline 1 105 3 1 4 5 1 36 1 Power Compressor 1 2...
Page 112: ...General Outline ESIE10 01 1 106 Part 1 System Outline 3 1 1 4 5 1 36 2 Power Compressor 3...
Page 113: ...ESIE10 01 General Outline Part 1 System Outline 1 107 3 1 4 5 1 36 3 Kit Pumps...
Page 122: ...General Outline ESIE10 01 1 116 Part 1 System Outline 3 1 1 4 5 1 36 12 Digital Inputs Board...
Page 123: ...ESIE10 01 General Outline Part 1 System Outline 1 117 3 1 4 5 1 36 13 Digital Outputs Board...
Page 124: ...General Outline ESIE10 01 1 118 Part 1 System Outline 3 1 1 4 5 1 36 14 Digital Outputs Board...
Page 127: ...ESIE10 01 General Outline Part 1 System Outline 1 121 3 1 4 5 1 36 17 Extension Control Fans 4...
Page 131: ...ESIE10 01 General Outline Part 1 System Outline 1 125 3 1 4 5 1 36 21 EEXV Compressor 1...
Page 134: ...General Outline ESIE10 01 1 128 Part 1 System Outline 3 1 1 4 5 1 36 24 EEXV Compressor 2...
Page 137: ...ESIE10 01 General Outline Part 1 System Outline 1 131 3 1 4 5 1 36 27 EEXV Compressor 3...
Page 138: ...General Outline ESIE10 01 1 132 Part 1 System Outline 3 1 1 4 5 1 36 28 Pumps Control...
Page 139: ...ESIE10 01 General Outline Part 1 System Outline 1 133 3 1 4 5 1 36 29 Terminals M1 M2...
Page 140: ...General Outline ESIE10 01 1 134 Part 1 System Outline 3 1 1 4 5 1 36 30 Terminals M3...
Page 141: ...ESIE10 01 General Outline Part 1 System Outline 1 135 3 1 4 5 1 36 31 Terminals M5 MQ...
Page 148: ...General Outline ESIE10 01 1 142 Part 1 System Outline 3 1 1 4 5...
Page 150: ...ESIE10 01 2 2 Part 2 Functional Description 3 1 2 5...
Page 170: ...The Digital Controller ESIE10 01 2 22 Part 2 Functional Description 3 1 2 4 5...
Page 200: ...Functional Control ESIE10 01 2 52 Part 2 Functional Description 3 1 2 4 5...
Page 202: ...ESIE10 01 3 2 Part 3 Troubleshooting 3 1 3 5...
Page 254: ...Alarms and Events ESIE10 01 3 54 Part 3 Troubleshooting 3 1 3 4 5...
Page 266: ...Controller Inputs and Outputs ESIE10 01 3 66 Part 3 Troubleshooting 3 1 3 4 5...
Page 280: ...ESIE10 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5...
Page 286: ...Pre Test Run Checks ESIE10 01 4 8 Part 4 Commissioning and Test Run 3 1 4 5...
Page 289: ...ESIE10 01 Running Data Part 4 Commissioning and Test Run 4 11 3 4 5 1...
Page 290: ...Running Data ESIE10 01 4 12 Part 4 Commissioning and Test Run 3 1 4 5...