Procedure to Remove Horizontal Vane
Si241305
6
Removal Procedure
5. Procedure to Remove Horizontal Vane
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Locate 9 screws on the
decoration panel under
the seal materials.
Remove seal materials in the
following sequence.
d
→
f
,
c
→
e
Number of screws
No. of screws
Seal material
c
: 7 pcs
Seal material
d
: 9 pcs
Seal material
e
: 7 pcs
Seal material
f
: 9 pcs
Total : 32 pcs
2
There are 23 other
screws.
3
Remove the 18 screws
on the swing motor side
and on the opposite
side to open the covers.
7 screws
7 screws
9 screws
9 screws