DAMA-SM-21-001
Part 6 Trial Operation and Field Settings
95
1. Pump Down Operation..........................................................................96
2. Forced Cooling Operation .....................................................................97
3. Silicone Grease on Power Transistor/Diode Bridge..............................98
Part 6
Trial Operation and
Field Settings
Summary of Contents for FTK Series
Page 2: ......