Pump Down Operation
DAMA-SM-21-001
96
Trial Operation and Field Settings
Reference
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Details
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4. After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 97 for forced cooling operation.
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
Hexagonal
wrench
Summary of Contents for FTK Series
Page 2: ......