SiMX042215E
Part 7 Trial Operation and Field Settings
101
1. Pump Down Operation........................................................................102
2. Forced Cooling Operation ...................................................................103
3. Trial Operation ....................................................................................104
4. Field Settings ......................................................................................105
4.1 When 2 Units are Installed in 1 Room..................................................105
5. Silicone Grease on Power Transistor/Diode Bridge............................106
Part 7
Trial Operation and
Field Settings