SiBE041012_B
122
Trial Operation and Field Settings
Part 7
Trial Operation and
Field Settings
1. Pump Down Operation........................................................................123
2. Forced Cooling Operation ...................................................................124
3. Trial Operation ....................................................................................126
4. Field Settings ......................................................................................127
4.1
When 2 Units are Installed in 1 Room..................................................127
4.2
Standby Electricity Saving....................................................................128
4.3
Facility Setting Jumper (cooling at low outdoor temperature) ..............129
4.4
Jumper and Switch Settings.................................................................130
5. Silicon Grease on Power Transistor / Diode Bridge ............................131