Trial Operation and Testing

1.

Trial operation and testing.

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable 

temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.

Use the remote controller for trial operation as described below.

2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C 

in heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test items. 

Trial operation from remote controller

1) Press ON/OFF button to turn on the system.
2) Simultaneously press centre of TEMP button and MODE button.
3) Press MODE button twice.

(“ ” will appear on the display to indicate that Trial Operation mode is selected.)

4) Trial run mode terminates in approx. 30 minutes and switches into normal mode. To quit a trial operation, press 

ON/OFF button.

Test items

Symptom

(diagnostic display on RC)

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating function

Refrigerant gas and liquid pipes and indoor drain hose extension are 
thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for interconnecting wire connections.

Inoperative or burn damage

Indoor or outdoor unit’s air intake or exhaust has clear path of air.
Stop valves are opened.

Incomplete cooling/heating function

Indoor unit properly receives remote control commands.

Inoperative

Summary of Contents for FTXL25J2V1B

Page 1: ...INSTALLATION MANUAL R410A Split Series Models FTXL25J2V1B FTXL35J2V1B ATXL25J2V1B ATXL35J2V1B DAIKIN...

Page 2: ...12 gitt i henhold til bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieniami Dyrektyw 18 n urma prevederilor 19 ob upo t...

Page 3: ...may cause overheating electric shocks or fire Make sure that all wiring is secured the specified wires are used and that there is no strain on the terminal connections or wires Improper connections o...

Page 4: ...ite where remote controller signals are properly received by the indoor unit within 7 metres CAUTION Do not install the air conditioner at any place where there is a danger of flammable gas leakage In...

Page 5: ...d push down on the hooks with the fingers of your other hand When there is no work space because the unit is close to ceiling CAUTION Be sure to wear protection gloves Place both hands under the centr...

Page 6: ...panel 50mm or more from walls on both sides Air filters Titanium apatite deodorizing filter 2 Air filter Titanium apatite deodorizing filter Filter frame Tab Service lid Opening service lid The servi...

Page 7: ...the wall with screws Recommended mounting plate retention spots and Dimensions Use tape measure as shown Position the end of a tape measure at Keep here the piece cut out from the unit for piping Liqu...

Page 8: ...pes keep the following precautions in mind Abnormal sound may be generated if improper work is conducted 1 Do not strongly press the refrigerant pipes onto the bottom frame 2 Do not strongly press the...

Page 9: ...the back of the indoor unit Pull them through the front side Bend the ends of tie wires upward for easier work in advance If the interconnecting wire ends are to be stripped first bundle wire ends wi...

Page 10: ...to remove the drain hose 2 Reattach the insulation fixing screw on the right as it was Forgetting to attach this may cause water leakages 3 Remove the drain plug on the left side and attach it to the...

Page 11: ...IRCUIT BREAKER AC CN E HA HE HL HN HR MR _A MR _B S U V W X A CONNECTION CONNECTOR Q L OVERLOAD PROTECTOR D V D DIODE Q M THERMOSWITCH DB DIODEBRIDGE R RESISTOR DS DIP SWITCH R T THERMISTOR E H HEATER...

Page 12: ...e 5 When connecting to a wired remote controller If work space is available on the right side of the indoor unit the work can be performed with the electrical component box attached Omit the steps inv...

Page 13: ...ct into the indoor unit electrical component box 2 Route the connection cord as shown in Figure 3 5 8 Install the indoor unit electrical component box in its original position 1 Install the flap 2 Ins...

Page 14: ...rly made WARNING Do not use mineral oil on flared part Prevent mineral oil from getting into the system as this would reduce the lifetime of the units Never use piping which has been used for previous...

Page 15: ...Refrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insulate both the gas and liquid piping and to provide i...

Page 16: ...cessary power consumption If the circuit breaker trips to shut off the power to the air conditioner the system will restore the original operation mode when the circuit breaker is opened again 2 Test...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...3P377527 2D 2017 02 Copyright 2014 Daikin...

Reviews: