17
|
Piping installation
Installer and user reference guide
61
FXFN50~112A2VEB
CO₂ Conveni-Pack: indoor unit
4P677925-1 – 2021.07
17 Piping installation
In this chapter
17.1 Preparing refrigerant piping
17.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
5].
NOTICE
The refrigerant R744 requires strict cautions for keeping the system clean, dry and
tight.
▪
Clean and dry: foreign materials (including mineral oils or moisture) should be
prevented from getting mixed into the system.
▪
Tight: R744 does not contain any chlorine, does not destroy the ozone layer, and
does not reduce earth's protection against harmful ultraviolet radiation. R744 can
contribute to the greenhouse effect if it is released. Therefore pay special
attention to check the tightness of the installation.
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant and
oil. Use K65 copper-iron alloy tube system for high-pressure applications with a
working pressure of 120 bar at the air conditioner side and 90 bar at the refrigeration
side.
▪
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
NOTICE
If the ability to close the stop valves for field piping is wanted, the installer MUST
install a pressure relief valve on the following piping:
▪
Outdoor unit to refrigeration indoor units: on liquid piping
▪
Outdoor unit to air conditioning indoor units: on liquid piping AND gas piping
Refrigerant piping diameter
Liquid piping
Gas piping
Ø9.5 mm
Ø12.7 mm
Summary of Contents for FXFN112A2VEB
Page 85: ......
Page 86: ......
Page 87: ......
Page 88: ...4P677925 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...