14
|
Unit installation
Installer and user reference guide
70
LREN8~12A7 + LRNUN5A7
CO₂ ZEAS outdoor unit and capacity up unit
4P704142-1 – 2022.08
Unit
A
B
C
LREN*
1940
1102
193
LRNUN5*
635
497
—
14.3.4 To install the outdoor unit
1
Position the unit onto the installation structure. See also:
2
Fix the unit onto the installation structure. See also
68]. Fasten the unit in place using four foundation
bolts M12. It is best to screw in the foundation bolts until their length remains
20 mm above the foundation surface.
20 mm
NOTICE
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a
3
Remove the slings.
4
Remove the cardboard protection.
14.3.5 To remove the transportation stay
NOTICE
If the unit is operated with the transportation stay attached, abnormal vibration or
noise may be generated.
The compressor transportation stays protect the unit during transport. They are
located around the middle compressor (INV2). During installation they must be
removed.
1
Loosen the compressor mounting bolt.
2
Remove the screw.
3
Remove and dispose of the transportation stay.
4
Tighten the mounting bolt to 12.3 N•m of torque.
5
Remove the 2 screws.
6
Remove and dispose of the transportation stay.