14
|
Unit installation
Installer and user reference guide
71
LREN8~12A7 + LRNUN5A7
CO₂ ZEAS outdoor unit and capacity up unit
4P704142-1 – 2022.08
1
4
2
6
3
(12.3 N·m)
5
14.3.6 To provide drainage
Make sure that condensation water can be evacuated properly.
NOTICE
Prepare a water drainage channel around the foundation to drain waste water from
around the unit. When the outdoor temperatures are negative, the drained water
from the outdoor unit will freeze up. If the water drainage is not taken care of, the
area around the unit might be very slippery.